Categories
News

West Hotel

Teaming up with HSW again at West Hotel.  Looking forward to another successful project!

See the DJC article.

Categories
Education Projects

Sister’s of St. Mary K-8

Sisters of St. Mary of Oregon K-8 school is a new 2 story 67,000 sf school located in Beaverton, OR.  SSMO features 25 modern classrooms, a cafeteria and dining facilities.

American Heating installed all the wet-side hydronics and dry-side mechanical components for this project.  Four rooftop mounted VAV units with heat recovery were installed to serve the building.  High efficiency boilers were installed to provide hot water re-heat to the terminal units.

 

 

Categories
Footer

Footer

Categories
Mixed Use / Multifamily Projects

Ladd Tower

Ladd Tower is a 23 story glass tower located in downtown Portland’s south park blocks.  Ladd Tower features 332 apartments above ground floor retail and a sub grade parking structure.

American Heating installed all the wet-side and dry-side mechanical components for this project.  337 vertical fan coils, 1 450-ton chiller, hydronic piping, fans and all ductwork were all installed as part of our scope.

We also performed the HVAC services for the First Christian Church Restoration, also located on the Ladd block.

Categories
Civic / Cultural Projects

Resource Access Center

Resource Access Center is an 8-story facility located in the heart of downtown Portland.  Built for the Housing Authority of Portland, the RAC will provide a day center to help transition people out of homelessness, a 90 bed 24 hour shelter, and five floors of permanent housing with 130 studio apartments.

American Heating installed all the wet-side hydronics and dry-side mechanical components for this project. Six large custom air handlers were installed to condition the building.  Condensing boilers and heat recovery technology was also used to ensure building energy efficiency.

A state of the art Trane building management system was also installed by AHI to serve the building.

 

 

Categories
News

New Seasons – Vancouver, WA

New Seasons is finally coming to Vancouver!  Fishers Landing residents are in for a treat!

DJC announcement.

Categories
Education Projects

Gilbert Hall

Gilbert Hall located on Pacific University’s campus is a residence hall that houses 157 students.  Recognizing the value in VRF technology, Pacific University chose this option over several others.  Gilbert Hall is one of five LEED certified buildings on campus.

American Heating installed all components for the City Multi VRF system.  The installation included (8) outdoor condensers, (55) indoor fan coils and (8) BC controllers.  Mitsubishi’s control system manages the many zones within the building.

Mitsubishi posted a case study on their website too.

 

 

Categories
News

East County Courts

We’re gearing up for the East County Courts project.  Excited to be working with Howard S. Wright on another great project!

DJC has some preliminary pictures up…

Categories
News

DJC 2011 Top Projects Finalists

DJC recently announced the finalists for 2011 top projects.  American Heating was involved with six of the projects that are nominated!

Check it out…

Categories
Projects Sports / Recreation

PGE Park (Jeld Wen Field)

PGE park was extensively renovated to prepare the stadium for Portland’s new major league soccer team. The renovations included the addition of a sit-down restaurant, remodeled locker rooms, renovated press boxes and the Providence rehabilitation clinic.

A Mitsubishi City-Multi system was installed to serve the new eastside grandstand and the Providence rehab clinic.

American Heating also performed the tenant improvement of the Providence Rehabilitation Clinic.